Back to top

Case Studies

Airedale Air Conditioning works with customers based in the UK, Europe and the rest of the world bringing them high efficiency air conditioning systems and world class customer service. If you are looking at an Airedale Air Conditioning solution, you will be in good company. We provide integrated cooling solutions, unrivalled after sales support and products and services designed to reduce carbon footprint year on year; all of which deliver market leading value. Don’t just take our word for it, below you can access just a few of our customer case studies.

Discover companies like yours who have found a winning formula with Airedale(24)

Reuters

Reuters

Date: 29th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

Airedale used its AsNew service to strip and rebuild 74 close control units in Reuters principal UK Data Centre in London. Replacement with complete units was deemed to be too risky as the Data Centre was live at all times and continuous system operation was crucial.

Read more

Harrogate International Centre

Harrogate International Centre

Date: 28th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

The Harrogate International Centre is now one of the world’s top conference and exhibition venues. Replacing existing R11 chillers, Airedale water-cooled systems are providing enhanced cooling of the 2000-seat auditorium, adjacent hotel and exhibition halls.

Read more

Yorkshire Building Society

Yorkshire Building Society

Date: 16th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

Priding itself on being one of the most cost-efficient building societies in the industry with an on-going commitment to the environment, the Society is counteracting increasing heat loads and rising fuel costs with Airedale’s advanced free-cooling technology, to provide reliable, low energy cooling for its call centre offices.

Read more

Vodafone UK

Vodafone UK

Date: 14th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

Development of its core building structure has seen Vodafone UK invest in a new, UK-based world headquarters with upgrading of existing Data Centres. Airedale used its AsNew facility to strip and rebuild close control units in a key Data Centre which was live at all times, where continuous system operation was crucial and replacement with complete units deemed to be too risky.

Read more

TRW Automotive

TRW Automotive

Date: 09th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

In a brand new TRW electronics assembly plant in Peterlee, Co. Durham, Airedale’s air conditioning products are playing a major role in the precise control of temperature and humidity as part of an integrated environmental solution.

Read more

Showing results 16 - 20 of 24