Back to top

Case Studies

Airedale Air Conditioning works with customers based in the UK, Europe and the rest of the world bringing them high efficiency air conditioning systems and world class customer service. If you are looking at an Airedale Air Conditioning solution, you will be in good company. We provide integrated cooling solutions, unrivalled after sales support and products and services designed to reduce carbon footprint year on year; all of which deliver market leading value. Don’t just take our word for it, below you can access just a few of our customer case studies.

Discover companies like yours who have found a winning formula with Airedale(24)

Airedale develops bespoke solution to solve DataCentre challenge

Airedale develops bespoke solution to solve DataCentre challenge

Date: 03rd August 2018  |   Posted by: Airedale Team  |   Posted in: Case Studies

Airedale design a solution to solve a difficult challenge with leak detection.

Read more

Tower of London

Tower of London

Date: 13th January 2016  |   Posted by: Airedale Team  |   Posted in: Case Studies

As part of a major refurbishment programme, Airedale was selected to supply two Ultima™ twin circuit compact chillers to deliver comfort cooling to the Tower of London.

Read more

ACIS™ provides the big picture at Brighton Digital Exchange

ACIS™ provides the big picture at Brighton Digital Exchange

Date: 29th July 2015  |   Posted by: Airedale Team  |   Posted in: Case Studies

The latest installation of Airedale’s Building Management System, ACIS™ (BMS) has been completed at the new, purpose designed data centre for Brighton Digital Exchange, and was delivered in collaboration with INS Sudlows Ltd.

Read more

London chiller logistics

London chiller logistics

Date: 06th March 2015  |   Posted by: Airedale Team  |   Posted in: Case Studies

Airedale International’s design engineers, service and controls experts formed part of a multi-disciplinary team managing a complex chiller design, manufacture and installation project involving two 40-minute helicopter lift operations onto the roof of the London offices of a global professional services firm.

Read more

BAE Systems

BAE Systems

Date: 19th February 2015  |   Posted by: Airedale Team  |   Posted in: Case Studies

Through an extensive programme of capacity control upgrades at one of its major Military Air & Information sites in North West England, global defence, aerospace and security company, BAE Systems, has achieved annual savings of 70-80% on its computer room air conditioning energy costs, equivalent to £350,000.

Read more

Vodacom

Vodacom

Date: 14th March 2014  |   Posted by: Airedale Team  |   Posted in: Case Studies

To meet the increase in demand for its data centre applications, Vodacom required a solution that would allow it to quickly roll out additional facilities without the time, high cost and logistical barriers associated with new builds, or the constraints of retrofitting facilities in existing buildings.

Read more

Bytemark Hosting

Bytemark Hosting

Date: 22nd January 2014  |   Posted by: Airedale Team  |   Posted in: Case Studies

Working in conjunction with Sudlows, Airedale’s SmartCool™ DX PAC units were specially adapted to provide direct fresh air free cooling for up to 90% of the year and deliver N+1 redundancy. A fresh air mixing box was also specially designed for the project.

Read more

University of Portsmouth Data Centre

University of Portsmouth Data Centre

Date: 06th November 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

Portsmouth University had a requirement for a high density, energy efficient cooling facility for its new £2.25m data centre. Working in conjunction with Sudlows, Airedale was selected for its ability to offer a complete solution encompassing British manufactured, high performance systems, advanced controls and expertise in integrating to third party systems, commissioning and ongoing service and support.

Read more

EMIS data centre

EMIS data centre

Date: 17th September 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

EMIS required a new 24/7 data centre as expansion to the existing facility in order to increase its secure and resilient capacity as it extends its range of services to GPs. The data centre incorporates a highly efficient, reliable cooling and monitoring solution designed by Airedale.

Read more

Custodian Data Centre

Custodian Data Centre

Date: 15th August 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

Working in direct partnership with Custodian, Airedale designed and built an intelligent, energy efficient data centre cooling solution that significantly reduces the need for mechanical cooling and provides fresh air free cooling up to 80% of the year.

Read more

Iceland Frozen Foods

Iceland Frozen Foods

Date: 17th July 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

Iceland worked with Airedale to deliver a standard, optimised, control system which could be applied across all stores to maintain store environments and produce significant energy cost savings.

Read more

London Data Exchange

London Data Exchange

Date: 14th February 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

LDeX prides itself in never having experienced a moment of downtime since it started operating. In line with LDeX’s requirements, Airedale has provided an integrated, efficient, reliable and expandable cooling solution across three data halls and in the UPS room.

Read more

UK Grid

UK Grid

Date: 30th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

Leading colocation provider UK Grid has an extensive UKwide, IP based network and supplies a range of connectivity solutions for its worldwide customers. Airedale is working closely with UK Grid to provide a customised, scalable and fully redundant cooling solution across a premium data centre space at UK Grid’s own new ‘carrier-neutral’ data centre in Manchester.

Read more

Adnams Brewery

Adnams Brewery

Date: 30th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

Adnams employs almost 300 people in its brewing and hotel businesses operating two hotels and 84 public houses. The installation of an energy efficient chiller supplied by Airedale, ensures that the environmental impact of new fermentation rooms is kept to a minimum.

Read more

Epson

Epson

Date: 29th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

Airedale’s air conditioning products are playing a major role in the precise control of temperature and air quality in critical areas and clean rooms at Epson's Shropshire facility. Epson has developed a positive partnership with Airedale to ensure maximum performance and energy efficiency through ongoing system development and maintenance.

Read more

Reuters

Reuters

Date: 29th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

Airedale used its AsNew service to strip and rebuild 74 close control units in Reuters principal UK Data Centre in London. Replacement with complete units was deemed to be too risky as the Data Centre was live at all times and continuous system operation was crucial.

Read more

Harrogate International Centre

Harrogate International Centre

Date: 28th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

The Harrogate International Centre is now one of the world’s top conference and exhibition venues. Replacing existing R11 chillers, Airedale water-cooled systems are providing enhanced cooling of the 2000-seat auditorium, adjacent hotel and exhibition halls.

Read more

Yorkshire Building Society

Yorkshire Building Society

Date: 16th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

Priding itself on being one of the most cost-efficient building societies in the industry with an on-going commitment to the environment, the Society is counteracting increasing heat loads and rising fuel costs with Airedale’s advanced free-cooling technology, to provide reliable, low energy cooling for its call centre offices.

Read more

Vodafone UK

Vodafone UK

Date: 14th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

Development of its core building structure has seen Vodafone UK invest in a new, UK-based world headquarters with upgrading of existing Data Centres. Airedale used its AsNew facility to strip and rebuild close control units in a key Data Centre which was live at all times, where continuous system operation was crucial and replacement with complete units deemed to be too risky.

Read more

TRW Automotive

TRW Automotive

Date: 09th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

In a brand new TRW electronics assembly plant in Peterlee, Co. Durham, Airedale’s air conditioning products are playing a major role in the precise control of temperature and humidity as part of an integrated environmental solution.

Read more

Superdrug

Superdrug

Date: 08th January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

Superdrug Stores PLC is a leading health and beauty retailer operating over 700 stores throughout the UK. Two of Superdrug’s West Yorkshire stores, Bradford and Halifax, required air conditioning systems for comfort and air quality. The Stores specified an energy efficient system which would keep a constant temperature of 18-23ºC.

Read more

Harrogate Hydro

Harrogate Hydro

Date: 02nd January 2013  |   Posted by: Airedale Team  |   Posted in: Case Studies

North Yorkshire based Harrogate Hydro provides leisure facilities to the Harrogate community and has 800 full time members. Three swimming pools offer a range of activities and Brimham’s fitness centre with its state of the art fitness equipment has a purpose built dance studio and changing rooms. Harrogate Council was aware that the nature of the complex and overall size of the building warranted air conditioning.

Read more

University of Leeds

University of Leeds

Date: 24th September 2012  |   Posted by: Airedale Team  |   Posted in: Case Studies

The high performance computing (HPC) facility of the University of Leeds provides its researchers with access to a large number of computer intensive servers for computational modeling. Higher densities have created an extra 30kW of load per 42U rack, which could not be cooled by conventional CRAC units. The University sought an alternative solution from Airedale that meets the University’s criteria of investment in energy efficient, latest technology in its data centres.

Read more

Victoria & Albert Museum

Victoria & Albert Museum

Date: 11th March 2011  |   Posted by: Airedale Team  |   Posted in: Case Studies

A Grade 1 listed building, the V&A houses a permanent collection of over 4.5 million objects spanning 5,000 years of art. Embarking on a £150 million renovation programme and with 1,000 computers on the site, there was a need for a new data centre and appropriate, reliable and efficient cooling of the space.

Read more

Showing results 1 - 24 of 24